Netcees

Netcees (http://netcees.org/index.php)
-   Discussion Board (http://netcees.org/forumdisplay.php?f=4)
-   -   Seattle tunnel may have to be sealed off due to mysterious object (http://netcees.org/showthread.php?t=40729)

PancakeBrah 12-19-2013 05:44 PM

Quit being stupid bros

Zen 12-19-2013 05:54 PM

Quote:

Originally Posted by Chyeahhh Guevara (Post 231568)
did I say what I believed in this thread before you posted? stop reaching and get thee entire fuck outta my thread. I didn't even give my opinion on the matter, didn't even say what I thought was blocking it, didn't say anything about a conspiracy, I just posted the video as is.

Funny thing is I got attacked by Swerve for something they said in the video, not me lol. The only thing stronger than what they are using to dig is a diamond, so if you're using the 2nd strongest man made object on Earth to dig then what would/could stop it?

Lol I never said you did say what it was. You're just easily offended and you've proven that. I don't have the energy to argue with you though. Carry on.

Split 12-19-2013 06:15 PM

Quote:

Originally Posted by Chyeahhh Guevara (Post 231527)
umm no, they did not stop it from drilling, it got stuck. Man it seems you guys are just pulling shit right out of your behinds to try and discredit this for whatever reason when all of the facts currently present regarding the issue are right there. I didn't make this shit up lol.

stop projecting

Chyeahhh!!! 12-19-2013 06:46 PM

he speaks....
 
Quote:

Originally Posted by Buddha (Post 231598)
Lol I never said you did say what it was. You're just easily offended and you've proven that. I don't have the energy to argue with you though. Carry on.

Lmao at you running away . I'm offended at you thinking I'm easily offended.

Fart 12-19-2013 06:50 PM

Lmao come on
demons in the sewer? that video is 24 mins of nothing

Chyeahhh!!! 12-19-2013 07:43 PM

Well nobody knows yet

Witty 12-19-2013 07:48 PM

Oh fuck sewer demons.

Chyeahhh!!! 12-19-2013 10:53 PM

Oh boy I love this shit lol

http://www.komonews.com/news/offbeat....html?mobile=y

Chyeahhh!!! 12-19-2013 11:01 PM

She’s sitting 60-feet underground between South Jackson Street and South Main Street among a mix of native dirt and fill tossed into place from as early as the 1800s.

She has just 450 more feet to travel before leaving that fill behind. It will also mark the end of phase one in the $4 billion tunnel project that will stretch 1.7 miles from adjacent to Safeco Field to Battery Street.

The drill head is made from armoured steel and the cutter heads (tips) are tungsten carbide (hardest man made material next a laboratory diamond). They will bore right through the absolute hardest of rock. It will even cut steel effortlessly.


All times are GMT -4. The time now is 06:08 PM.

Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
User Alert System provided by Advanced User Tagging (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.